Upon passing the SAP C-TS422-2021 certification exam, candidates will be awarded the SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification is recognized globally and demonstrates a candidate's expertise in SAP S/4HANA Production Planning and Manufacturing.
SAP C_TS422_2021 certification exam consists of 80 multiple-choice questions that need to be completed within a time frame of 180 minutes. The questions are designed to test the candidate's knowledge of SAP S/4HANA production planning and manufacturing concepts, as well as their ability to apply these concepts to real-world scenarios. C_TS422_2021 exam is computer-based and can be taken at any authorized SAP testing center or remotely via a virtual proctoring system.
NEW QUESTION # 48
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
- A. Model a transportation resorce in the location master.
- B. Model a seperate resource in the production data structure.
- C. Model a handling resource in the location master and goods receipt time in the material master.
- D. Model a resource inbound in the location master.
Answer: A,C
NEW QUESTION # 49
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP Fieldglass
- B. SAP Hybris
- C. SAP SuccessFactors
- D. SAP Concur
- E. SAP Ariba
Answer: A,D,E
NEW QUESTION # 50
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?
- A. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
- B. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
- C. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
- D. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
Answer: D
NEW QUESTION # 51
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?
- A. Use specific MRP controller
- B. Use a specific MRP type
- C. Use a specific material group
- D. Use a specific material status
Answer: A,C
NEW QUESTION # 52
You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?
- A. Set the creation indicator for purchase requisitions on initial screen of MRP run
- B. Add the agreement to the source list and mark it for MRP revalance.
- C. Add the agreement to the quota arrangement and mark it for MRP revalance.
- D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
Answer: B,D
NEW QUESTION # 53
For a production version to be valid and consistent what requirements must be fulfilled?
- A. The lot size range must be within the lot-size range of the assigned routing.
- B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- C. The assigned routing must be a rate routing.
- D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- E. The assigned routing must NOT have alternative sequences.
Answer: A,B,D
NEW QUESTION # 54
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with prioritized alternative work centers
- B. A production line with an alternative sequence in the routing
- C. A production line with a parallel sequence in the routing
- D. A production line with more than one work center
Answer: D
NEW QUESTION # 55
Which time elements are part of a routing operation?
- A. Queue time
- B. Float before production
- C. Move time
- D. Wait time
- E. Pick/pack time
Answer: A,D,E
NEW QUESTION # 56
What is the purpose of collective orders?
- A. To post production costs on a cost collector instead of the production order
- B. To manage production orders for an entire finished product on multiple levels
- C. To post any component withdrawal as single backflush with order confiramtion
- D. To combine order management of co-products any by-products with the main product.
Answer: B
NEW QUESTION # 57
What are the consequences if the Dispatched operation status is set for a production order operation?
- A. You can reschedule the order using infinite scheduling in a planing table
- B. You can reschedule the operation using lead time scheduling in a planning table
- C. You can reschedule the operation using midpoint scheduling in a planning table.
- D. You can reschedule the operation using finite scheduling in planning table
Answer: B,D
NEW QUESTION # 58
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?
- A. Assign planned orders manual lying the planning table.
- B. Run MRP with quota arrangement.
- C. Run MRP with automatic selection of production version.
- D. Run PP/DS heuristics for repetitive manufacturing.
Answer: B,D
NEW QUESTION # 59
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A. By usage probability
- B. Simultaneous
- C. First in first out (FIFO)
- D. 100% check
Answer: A,D
NEW QUESTION # 60
How can you achive a feasible production plan in case of capacity constraints?
- A. Select an alternative mode on a resource.
- B. Reduce the planning window
- C. Form optimum sequence to reduce setup times
- D. Execute an infinite production planning run
- E. Adjust the available capacity.
Answer: A,C,E
NEW QUESTION # 61
What does forecasting in demand planning cycle include?
- A. Past quotation quantities
- B. Past procurment quantities
- C. Past sales order quantites
- D. One-off events
- E. Market intelligence
Answer: C,D,E
NEW QUESTION # 62
When can the automatic material availability check occur in a production order?
- A. At order creation
- B. At order confirmation
- C. At order release
- D. At order settlement
Answer: A,C
NEW QUESTION # 63
How can you limit the validity of a bill of material (BOM)?
- A. By material type
- B. By industry
- C. By period
- D. By plant
Answer: C,D
NEW QUESTION # 64
How can you carry out cost object controlling for production orders?
- A. Cost-related
- B. Product-related
- C. Order-related
- D. Milestone-related
Answer: B,C
NEW QUESTION # 65
What is the purpose of a reporting point confirmation in repetitive manufacturing?
- A. To stage different components for a production line simultaneously
- B. To provide timely updates of inventory management for the staged components
- C. To determine the work in progress along the production line
- D. To reduce the total production lead time for along production line
Answer: B,C
NEW QUESTION # 66
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Setup matrix
- B. Operation network
- C. Resource network
- D. Work center hierarchy
Answer: D
NEW QUESTION # 67
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
- A. Insert operation
- B. Squeeze in
- C. Schedule in working time only
- D. Find slot
Answer: D