NEW QUESTION 29
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.
- A. Work Order (WO-1025) is not a Back-to-Back Work Order.
- B. Work Order (WO-1025) is not a Plan-to-produce Work Order.
- C. Work Order (WO-1025) is not a Pick-to-order Work Order.
- D. Work Order (WO-1025) is not a Configured item Work Order.
- E. Work Order (WO-1025) is not a Drop-ShipWork Order.
Answer: D,E
NEW QUESTION 30
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.
- A. The user doesn't have Override Item Structure Components in the Work Definition privileges.
- B. An itemcannot be assigned on an ad hoc basis.
- C. The user doesn't have access to the PIM module.
- D. The user doesn't have Data access to create item structure.
Answer: B
NEW QUESTION 31
Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the ManufacturingCloud?
- A. Use Business Intelligence answers to create the report.
- B. Use the Manufacturing subject area to select the report columns and create the report.
- C. Use ibots to create the report.
- D. Use Business Intelligence publisher to create a template anduse that template to create the report.
Answer: A,D
Explanation:
Explanation
You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence Publisher to create reports.
NEW QUESTION 32
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.
- A. 60 hours
- B. 76 hours
- C. 70 hours
- D. 78 hours
Answer: D
NEW QUESTION 33
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?
- A. The engineer does not have Data access to Items.
- B. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
- C. The engineer does not have the Manage Work Definitions function privilege.
- D. The engineer does not have Dataaccess to Item Structures.
- E. The engineer does not have Data access to Items Attributes.
Answer: B,C
NEW QUESTION 34
Identify three types of Item Quantities displayed in the Work Order History tab.
- A. Completed Quantity
- B. Remaining Quantity
- C. Scrapped Quantity
- D. In Process Quantity
- E. Total Quantity
Answer: A,B,C
NEW QUESTION 35
Identify three requirements fulfilled by nonstandard work orders.
- A. Repair
- B. Rescheduling
- C. Prototype
- D. Rework
Answer: A,C,D
NEW QUESTION 36
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.
- A. Select the Count Point check box while defining the Standard Operation.
- B. Select the Automatically Transact check box while defining the Standard Operation.
- C. Deselect the Count Point check box while defining the Standard Operation.
- D. Ensure that the Charge Type of the resource is Automatic.
Answer: A
NEW QUESTION 37
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?
- A. Create Work Definitions
- B. Create and update ATO (Assemble To Order) model work definitions
- C. Update Work Definitions
- D. Populate Descriptive flexfields
Answer: B,D
NEW QUESTION 38
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?
- A. Select the infertile Dispatch List> Select awork order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
- B. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work ordername> Tap or click the Release action, and click OK
- C. Select the infotile On Hold> Select awork order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
- D. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
Answer: A
NEW QUESTION 39
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception andwho gets notified after an exception is raised?
- A. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.
- B. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
- C. The Production Operator can report anexception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
- D. The Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant.
Answer: C
NEW QUESTION 40
A plantruns 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.
The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
- A. 1:00 PM
- B. 12:30 PM
- C. 8:00 PM
- D. 4:00 PM
- E. 2:00 PM
Answer: D
NEW QUESTION 41
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
- A. Click Outsidethe existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.
- B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units inDefault Availability column.
- C. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
- D. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
Answer: A
NEW QUESTION 42
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
- A. Transfer Transactions from Production to Costing
- B. Transfer Costs to Cost Management
- C. Create accounting
- D. Transfer Transactions from Inventory to Costing
Answer: A
NEW QUESTION 43
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.
- A. Procurement
- B. Inventory Min-Max Planning
- C. Planning
- D. Order Management
- E. Quality
Answer: A,C,D
NEW QUESTION 44
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.
- A. Resource transaction GET method
- B. Work Order Status POST method
- C. Work Order Status GET method
- D. Resource transaction POST method
- E. Work Orders PATCH method
- F. Work Orders GET method
Answer: C,D,E,F
NEW QUESTION 45
To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.
- A. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
- B. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
- C. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.
- D. Change the Supply Type = Push in Itemdefinition and Work Definition, for subassemblies having high inventory stock.
Answer: A
NEW QUESTION 46
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.
- A. The Count Point check box is deselected.
- B. The Count Point check is selected.
- C. There are no components attached to it.
- D. The Automatically Transact check box is selected.
- E. The Automatically Transact check box is deselected.
Answer: A,E
NEW QUESTION 47
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.
- A. Costing Priority
- B. Delete an Operation
- C. Production Priority
- D. Add an Operation
- E. Completion Subinventory
Answer: C,D,E
NEW QUESTION 48
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
- A. Costs for purchase components P1and P2 are not defined in cost accounting.
- B. Create Accounting Distributions was not initiated.
- C. Create Accounting was not initiated.
- D. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
Answer: B
NEW QUESTION 49
Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automaticwork definition.
- A. Product Management> Product Information Management> Items> Edit Item > Actions> Create automatic work definition
- B. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation> Actions> Create automatic work definition
- C. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work definition
- D. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition
Answer: B
NEW QUESTION 50
......